Klubben

Nyhetsbrev fra Course Manager -August

Av: Øystein Schille  |  Publisert: 14. august 2017  |  Siste nyheter  |  Arkiv

Dreneringen testet -og vel så det!

Dear Members
 
I hope as I write this we have seen the end of the rain that has been pretty constant over the last 2 weeks here at Losby, to date 127mm since the 29th of July. The one positive of the rain is the 4th fairway drainage has been tested fully, the results we have seen are excellent, hole 1 drainage which we completed last year also is functioning superbly, we hope to drain the middle of fairway 17 this year, I will keep you updated what our plans are going forward.
This week we hope to be able to complete the remaining work on hole 4, jobs remaining are to fill and turf the main drainage line that runs the length of the fairway, finish and tidy the cart path which also includes drainage.
Notable jobs completed the last few weeks are:
  • Grooming all greens followed by a light sand dressing, this was done on 24/7 and 8/8
  • Deep aeration work on greens, we used 8mm tines at a depth of 25cm, this was done over 3 days starting on 2/8
  • Scarifying of fairways 12 and 15
  • Aeration work on tees using 12mm solid tines at a depth of 15cm
 
This week’s Grass Cutting heights:
Greens: 3,25 mm
Tees and Approaches: 8mm
Fairways: 12mm
Semi: 21mm
Rough: 57mm
 
Be back soon with another update.
Best Regards
Duncan and Team.


 
  
Dette nettstedet bruker cookies (informasjonskapsler) for å tilpasse nettsidene bedre til deg som bruker. Klikk OK for å godta dette Les mer om cookies og personvern her